Event: PIANC-COPEDEC 2008

Number of items: 3.

Innovative techniques to reduce or remove the need for a breakwater.
Cruickshank, I.C.and Tozer, N.P. and Beresford, P.J. and Grey, S.M.
In: PIANC-COPEDEC 2008, 23-28 February 2008, Dubai, UAE. (2008)

Integrated hydraulic studies to support the masterplan for Mundra Basin Port, Gujarat State, India.
Chesher, T.J.and McBride, M. and Skula, M.P. and Smallman, J.V.
In: PIANC-COPEDEC 2008, 23-28 February 2008, Dubai, UAE. (2008)

Site selection and planning issues for new LNG marine terminals.
Cork, S.and Bentiba, R.
In: PIANC-COPEDEC 2008, 23-28 February 2008, Dubai, UAE. (2008)

This list was generated on Thu Mar 23 23:13:28 2017 GMT.